HomeIndustries › Cement

Cement Gearbox Repair

Rebuilds, emergency service, and cash buyouts for cement gearboxes and drives.

Gearbox repair for Cement

Kiln drives, vertical mill reducers, and separator drives are the heart of a cement plant — massive, expensive, and catastrophic to lose. We also run a dedicated cement site at cementgearboxrepair.com.

Typical equipment we quote in this sector: kiln drives, vertical roller mills, separators, bucket elevators, clinker conveyors. We arrange rebuilds through AGMA-experienced gear shops with in-house hobbing, grinding, and magnaflux — 5–14 day standard turnaround, 24–72 hour emergency response when a line is down.

We also work the other side of the same problem: when a drive isn't worth fixing, we buy it for cash — along with the surplus spares on your shelf and whole decommissioned lines. One call covers repair quote, replacement sourcing, and buyout offer.

💵 Plant managers: we pay cash for surplus and failed gearboxes, gearmotors, and complete drive packages. Nationwide freight arranged. (412) 557-4495.

Why plants in this sector call us

Both sides of the decision

Repair estimate AND cash buyout in one quote — nobody else shows you both numbers up front.

Speed when it counts

24–72 hr emergency rebuild service versus 16–30 week new-unit lead times.

Every brand

Falk, Flender, SEW, Sumitomo, NORD, Philadelphia, Lufkin, David Brown and 50+ more.

Nationwide logistics

Freight, rigging coordination, and pickup handled — you ship nothing yourself.

Get your quote

Or call/text (412) 557-4495.